Plant and Truck Certification Program

The Plant Inspector's Guide ensures the auditing

of the following items during plant inspection:

  • Ingredient materials for concrete are managed to maintain their characteristics.
     

  • The production facility has the capability of producing concrete in cold weather.
     

  • The batching systems in operation are defined and measuring devices are verified for accuracy at stated frequencies.
     

  • The batching systems are capable of accurately batching concrete without interferences.
     

  • The batching process complies with the required tolerances stated in industry standards.
     

  • There are systems in place and operational to account for aggregate moisture when batching concrete.
     

  • There are systems in place and operational to manage the required slump and consistency of concrete.
     

  • Production facilities with a plant mixer (central mixing plant) is of adequate condition to produce uniformly mixed concrete.
     

  • The production facility issues a delivery ticket that conforms to the mandatory reporting requirements of ASTM C 94.
     

  • Evaluates the recording capabilities for batched materials at the concrete plant and states such on the certificate.
     

  • That 90% of the delivery fleet operating from the plant maintain current certification.
     

  • The delivery fleet has the ability, via a visual inspection, to produce uniformly mixed concrete and has necessary devices in proper operating condition.
     

  • Requires attestation to the completeness of the inspection by a licensed professional engineer.
     

  • Requires statement by a company official that the accuracy of measuring devices will be maintained in conformance for the duration of the certification.
     

  • Inspectors and their assistants have to go through a qualification process and be approved by NRMCA to conduct inspections for this program. The qualification process requires a thorough reading of the plant inspectors guide followed by answering a series of questions, submission of a statement of qualifications and signing a pledge.
     

 

 


 

 

About NRMCA  |  Privacy Statement

© National Ready Mixed Concrete Association, 2013

 

free tracking

 

 

 

 

 

Certifications:

Plant & Truck

Personnel

Quality

 

Technical Webinars

 

Technical Articles

 

  R&E Awards:

Gaynor Award

Quality Award

 

Life-365 Software

 

Featured E-Store Items

 

Staff and Contact Info